|
Код: 10198
|
Continuous Monitoring of Longwall Under-mining - Blakefield South LW1 [943] Steven Garlinge, James Barbato 2011 г.
|
|
Подробнее
|
|
Код: 10199
|
Development of an Interface Program to Control a Robotic Total Station [972] Luis Veiga, Pedro Faggion, Carlos Nadal, Marcos Nadal 2011 г.
|
|
Подробнее
|
|
Код: 10200
|
Finite Element Modelling for Designing Geodetic Deformation Permanent Monitoring Projects - the Case of Hydro Power Plant and Large Dam [1643] Mohammed Haider Abusharkh, Joel van Cranenbroeck, Omid Shayan 2011 г.
|
|
Подробнее
|
|
Код: 10201
|
Landslide Movement Monitoring Using the Space-born Technique of SAR Interferometry and Global Positioning System [1013] Mehrdad Akbarimehr, Mahdi Motagh, Mohammad Ali Sharifi, Omid Elmi 2011 г.
|
|
Подробнее
|
|
Код: 10202
|
Two-dimensional Finite Element Modelling of Ground Deformation and Stress Field As-sociated with Fault Motion [949] Alireza Azmoudeh Ardalan, Natasha Khazaee 2011 г.
|
|
Подробнее
|
|
|
Регламенты
25 декабря 2013
09 января 2014
|