 Код: 10198
|
Continuous Monitoring of Longwall Under-mining - Blakefield South LW1 [1039] Steven Garlinge, James Barbato 2011 г.
|
|
Подробнее
|
|
 Код: 10199
|
Development of an Interface Program to Control a Robotic Total Station [1071] Luis Veiga, Pedro Faggion, Carlos Nadal, Marcos Nadal 2011 г.
|
|
Подробнее
|
|
 Код: 10200
|
Finite Element Modelling for Designing Geodetic Deformation Permanent Monitoring Projects - the Case of Hydro Power Plant and Large Dam [1792] Mohammed Haider Abusharkh, Joel van Cranenbroeck, Omid Shayan 2011 г.
|
|
Подробнее
|
|
 Код: 10201
|
Landslide Movement Monitoring Using the Space-born Technique of SAR Interferometry and Global Positioning System [1114] Mehrdad Akbarimehr, Mahdi Motagh, Mohammad Ali Sharifi, Omid Elmi 2011 г.
|
|
Подробнее
|
|
 Код: 10202
|
Two-dimensional Finite Element Modelling of Ground Deformation and Stress Field As-sociated with Fault Motion [1050] Alireza Azmoudeh Ardalan, Natasha Khazaee 2011 г.
|
|