Главная » Библиотека » Конференции
Конференции
Описание
Civil Structural Health Monitoring Workshop. Berlin. Germany. 2012. Report. As an alternative to the stick-build truss widening specified for the Huey P. Long Bridge, the MTI Joint Venture proposed a pre-built truss erection alternative to reduce impact on public, rail and river traffic requiring the lifting of three sets of paired trusses over 500-ft long, weighing more than 2700 tons. A real-time, remote monitoring system was used during the transport, lift and setting operation to limit truss distortion during the lifting and skidding operation.
Содержание
|
Регламенты
25 декабря 2013
09 января 2014
|